Switching

Discuss Catalyst brand switches with peers and experts.
cancel
Showing results for 
Search instead for 
Did you mean: 
cancel

Get 20% off switches when you combine Cisco solutions

 
Labels

Forum Posts

I have 9200 switch with TtenGigabitEthernet Transceiver Module. Connected through (not sure but will confirm tomorrow) WDM to another switch. sh inventoryNAME: "c92xxL Stack", DESCR: "c92xxL Stack"PID: C9200L-24T-4X , VID: V01 , SN: XXXXXXXXXXX NAME:...

Can we use BPDU guard and BPDU filter command on same switch port along with port-fast as BPDU guard error-disables the port and BPDU filter drops the incoming BPDUs on port so here two action would happen simultaneouslyplease explain.

knaik99 by Level 1
  • 429 Views
  • 2 replies
  • 0 Helpful votes

C9200L-48PXG-2Y48 ports full POE+ (8 mGig ports up to 10G, 40 ports up to 1G)2x 1/10/25G fixed uplinksPWR-C5-1KWACFixed redundantFrom this spec, I think that this switch will come with full POE+, 40 ports of 1G, and 8 ports of 10G. For the fixed upli...

DanDo by Level 1
  • 257 Views
  • 1 replies
  • 0 Helpful votes

Recently we have been warn by our security team for a SSH vulnerability been detected on our Cisco devices (Cisco catalyst 2960, 3560) using McAfee Foundstone.Our ssh version is 2.0 and we did change the RSA key to 2048 but then the result still the ...

I am looking to buy a few POE 48 port switches and I have narrowed it down to either  - Cisco CBS250, Managed, L3, Gigabit Ethernet (10/100/1000), Power over Ethernet (PoE), Rack mounting, 1U CBS250-48P-4X-UK or Cisco Small Business SG220-50P, Manage...

meeee by Level 1
  • 254 Views
  • 0 replies
  • 0 Helpful votes

Resolved! Network Support

C9200L-48P-4X48 ports full PoE+4x 1/10G fixed uplinksPWR-C5-1KWACFixed redundantI'm trying to order a 9200 Catalyst switch. By looking at the spec above, My understanding that this switch will come with 48 copper ports full PoE+ and 1G speed on each ...

DanDo by Level 1
  • 329 Views
  • 1 replies
  • 0 Helpful votes

I am planning for upgrading 4507R-Sup7 in SSO mode with 2 modules.Current version >> 03.04.03.SGPlanning version >> 03.11.05EWhen checked the rommon version, it is belowM Hw Fw Sw Status--+--------------------------------+---+------------+-----------...

I'm trying to configure a SPAN port in 9300 switch but the interface is up but line protocol downthis is the configuration Switch(config)#monitor session 1 source VLAN 1Switch(config)#monitor session 1 destination interface GigabitEthernet2/0/15this ...